Showing posts with label Layout Update. Show all posts
Showing posts with label Layout Update. Show all posts

Thursday, July 9, 2026

Tuesday, September 6, 2022

Layout Update - Pre Open House Preps and Goodbye to a friend


This is a fairly long blog post. After not doing much of anything model railroading related for a few weeks, there's been a flurry of different activities going on in the layout room this past weekend. Not only do I want to get some of these items off the to-do list for the open house, spending some time in the basement definitely helped take my mind off another, less pleasant aspect of the last two weeks (more on that below). 

Stic came by and we finished up the final benchwork cutting and fitting for the rework of the paper mill peninsula. The recessed area in the foreground will be part of the mill race. We worked through the details of the track arrangement, sticking pretty close to the plan (seen HERE) although I did add another spur that ends at the mill race that I only recently noticed in a few prototype photos. 

The track is (obviously) temporarily positioned in this photo. I'd hoped to avoid hand laying a turnout but frankly the track will flow much better if I do so that's a big item on the to-do list this week. Goal for the MARPM open house is get the track in place, wired, and tested and the fascia installed. 


One easy task was getting a couple more roads paved. I smoothed out my custom blend of gray and dark gray (almost black) sanded tile grout using a foam brush, and soaked it. After it dried overnight it looked like older, faded asphalt pavement - exactly the look I was going for. 

In an old photo of Enosburg Falls there was a garage like building facing Pleasant Street just south of the tracks. There was also a small door at approximately boxcar floor height alongside the track. Somewhere in the past someone told me this was actually a small warehouse for a local lumber dealer. I cobbled up my version of the building in an afternoon. Behind the building, and along the tracks, there was a coal shed. It's shown here with the shed from MineMount Models McGuirk Coal kit. I may end up building a different shed for this spot, but the overall dimensions will be similar. I also cobbled up a coal drop for this lumber/coal dealer using some styrene sheet. 

The other ongoing project, which is going to take a while, is ballasting the track that's in place. I managed to get a lot of the track in Enosburg Falls ballasted yesterday. I'll simply keep the stuff needed to complete ballasting at hand and do a little bit every evening - perfect task for 15-30 minutes a day! 

**********************************************************************

Beauregard (Beau) 2008-2022

Anyone who's come to visit or operate on my layouts, watched my videos, or even followed this blog know about our Basset Hounds - Beauregard and Molly. We adopted them in 2008 when they were just shy of a year old and they've been part of lives - and my model railroading buddies - ever since. 

He lost his sight suddenly last winter but since he was a scent hound he recovered from that quite well - although he could no longer safely go up and down stairs. Then in May he starting suffering from repeated bouts of a canine version of vertigo that he frankly never really got over. This was compounded by other health issues more recently. While he was a real trooper until the end we knew in our hearts he wasn't happy and was simply fighting his best to stay around for us. And that didn't seem fair. Sadly, last week we made the gut wrenching decision to say goodbye to Beau. We miss him terribly and really haven't adjusted to not having him around. 

Every dog owner will tell you they've had one dog that they simply can't forget. And although I love Molly, Beau always was and will always be my "one truly special dog." 

The photo below shows Beau in the alert Basset position. Next to him is a pair of my dad's socks that Beau had liberated from Dad's suitcase. 

As my Dad described him years ago "He's not a dog, he's a clown wearing a dog costume!" 



Monday, March 8, 2021

Why no backdrops?

Why I didn't add backdrops (other than the room walls) to my layout can be summarized by this photo. 
 
I got an interesting email on one of my recent video layout updates the other day. ***

Essentially, the email questioned why I didn't include backdrops along behind both peninsulas and behind the "front" section of the layout where the Enosburg Falls and "Junction" scenes are located. An earlier view of the layout from the front "viewing aisle" is shown below for reference:


There's a couple of reasons I didn't include backdrops on those sections of the layout. In no particular order they are:

1. One of the toughest things to deal with in model photography and videography are shadows reflected from the 3-d world onto the 2-d wall, which is supposed to represent sky. Last time I checked, the sky outside my window doesn't reflect anything. 

Adding more backdrops is simply adding more walls - creating more distracting shadows that have to be addressed. 

2. Somewhat related to #1 is the issues with lighting that additional backdrops would introduce. If there's one area where we model railroaders really need to focus it's on thinking through and improving layout room lighting. I really failed in this area on my previous layout, and although I feel the current layout room lighting is better,  it's far short of ideal. 

More backdrops means more light is getting blocked from reaching the layout - the solution of just adding more light fixtures in the hope the problem goes away only goes so far!

3. Multiple peninsulas broken up with backdrops may help create a sense of isolation and distance - and if that's the goal that's fine. But such a benchwork footprint usually means narrow shelves (a few inches on each side of the track has been promoted by some) which may serve the purpose of stretching the mainline length but at the expense of visual impact. The only photo angle available is the "extreme 3/4 wedge shot." Worse than that, when viewing the layout in person you will find it a struggle to achieve the sense of a train in the environment - it usually looks like exactly what it is - a model train running along a narrow shelf with a modicum of scenery on each side. 

The 3/4 wedgie view of a train - you better like this perspective - a lot - unless you include some deeper scenes somewhere on your layout. 

4. The last, and perhaps most important reason I didn't add a bunch of backdrops to the layout room is simply the fact that I enjoy stepping back and surveying the landscape. In person it's pleasant to look at the layout. And, when you drop the camera down to eye level you can achieve some truly deep, realistic vistas. 

If you don't care for my thoughts on rabbit warren layout design, you don't want to hear about my preference for continuous running! 

(***I tried to illustrate some of this in my latest video layout update - you can see that on YouTube by clicking HERE. )


Monday, July 27, 2020

Video Layout Update #7

I just posted a video layout update to my "CVSNE" YouTube channel. 

You can find the video HERE



Monday, December 23, 2019

End of Year Progress Report

I'd mentioned in a previous post that we were having a holiday open house for our neighbors. Happy to report the event was a complete success. It's always interesting to see the reaction of non-modelers to a scale model railroad. A lot of people mentioned they'd expected to see a train around the tree, or perhaps a Christmas Garden* - instead when they came downstairs they saw, well, this.... 
I managed to add some initial scenery to the front corner by the entry to the layout area prior to our open house. I'm happy to report that the trees that were carefully packed up by my father close to two years ago survived the move and storage. 
Take this as an end-of-year report on the status of the Richford Branch. 
I placed the cannery in the front entrance area. The structures, such as the barn in the background and the various buildings visible in the previous photo, are stand-ins. 
The stationary end of the swing gate
 showing the slot the gate slides into. 
 The entire mainline "loop" is in place, including the swing bridge track. The photos show how it's constructed and how it works. Essentially, the swing gate surface slides beneath a piece of mdf that's secured to the plywood subroadbed with a gap between the underside of the MDF and the layout frame. 
Action shot! The end of the swing gate. Note the
paint scrapes indicating the friction lock.
 
To date friction does a fine job holding the track in place. At some point we'll add some sort of locking mechanism and a perhaps an electrical interlock to kill power when the bridge is open. 
Closed position. I soldered the rail to
some PC board ties on both the gate
and the layout to help keep the rails aligned. 
The trains ran just fine over this bridge for more than 4 straight hours - so I consider the swing gate a complete success. 
With the mainline in place and operating, I've turned my attention to the two peninsulas - the papermill peninsula and the Richford peninsula. 
A set of Fast Tracks twist ties glued to a piece
of 1/8" plywood to form the lead into the paper mill yard. 
After playing around with flextrack for an afternoon, it became obvious the paper mill
 peninsula would benefit from a handlaid turnout or two. Besides, I continue to have issues with ME turnouts, meaning I might be handlaying all the turnouts on the two peninsulas.
I also have been laying out the track for the Richford yard. But that deserves it's own blog post. 


Monday, December 2, 2019

Overdue Updates and Open House Preps

 It's been a couple of weeks since I last posted an update - 
1. Benchwork: All the layout framework and fascia are complete. And the fascia has been painted with two coats of "Riverway" - the same dark gray/green that's painted on the walls beneath the layout. 
2. Trackwork: The mainline loop is complete, in, and operational - including the track across the swing gate. Roadbed is in place on the paper mill peninsula, and I've been finalizing the track arrangement on the large Richford peninsula. 
3. Structures and Scenery: I will do a separate post to show the latest on the Farm Implement dealer to continue that series of posts. And while there's no progress to show on scenery as of yet, I have been positioning some structures, mostly leftovers from my previous layout, in various spots. Some of these will be permanently installed, others will serve as placeholders - helping to get the layout to a "finished" or semi-finished state for our open house later this month. 
Yes, the first public showing of the layout will be later this month. The event is a neighborhood holiday open house. The stated purpose is to show off the Christmas decorations in the houses around the neighborhood, but everyone, and I mean everyone, has heard about the "train set up" in our basement. Even people we've never met. So we fully expect we're going to get a bunch of visitors who won't even glance at the decoration upstairs as they make a beehive for the basement! 
I will try to do a video update at some point in the near future, but frankly "getting the layout ready for visitors" is the top priority!


Friday, October 18, 2019

Swing Gate v1.0

If you looked at Video Update #6 you saw a live demonstration of the swing gate. Actually, the gate in the video wasn't quite complete - so in the interest of full disclosure here are some photos showing that it is indeed more than just a "piece of plywood and a couple of hinges..."
The underside of the plywood "bridge" is braced along most of its length by a plywood brace. Note how the brace gets thinner as it gets further from the hinges - an attempt to minimize sag and at the same time minimize the pressure on the hinges!
That plywood brace is itself strengthened by a couple of pieces of 1 x 2 arranged in an "L".

The hinge end with the bridge in the open position shows the hinge arrangement - nothing fancy here, I told Stic to just be sure everything was really sturdy! I think there's two boxes of screws holding this thing together!
This shot shows the swing gate in its fully open position - it opens up enough to touch the fascia on the layout. 
Next trick is to figure out how to get the track in place. Stic tells me that's my problem. 
Thanks to Stic Harris for his help with this project, and with all the various thankless tasks I always seem to assign him! 
Today also happens to be his 50th birthday. He's taking a well-earned respite from model railroading to enjoy coastal Maine with his lovely wife. And he's officially joined the ranks of those us who complain we're too stiff, sore, or otherwise impaired to work on top of or under our layouts!



Thursday, October 17, 2019

Video Layout Update #6

Just released on my YouTube Channel!

A video update on the Richford Branch layout - including the chance to see Stic Harris conduct the first "walkthrough" of the swing gate. 

Plus some other stuff. 

What else could you possibly waste 5 minutes and 41 seconds on? (don't worry, it's not Stic the whole time....)

Just click HERE to go directly to the video. 




Friday, October 11, 2019

Just about reached the end ...

I've started to experiment with photo backdrops. Yes, I plan to trim it to the ridgeline and not have the white borders on the final backdrop!
... of the woodworking phase of layout construction! 
Two significant (at least to me) accomplishments in the model railroading realm this week. 
First of all, I'm happy to report that the significant benchwork construction is (at long last) completed - that means all the subroaded and fascia has been installed, See below for an overall view of the layout:


At this point the only construction left is to complete the swing gate and install a couple of shelves in some key locations. The shelves will prove useful for a place for visitors and operators to put their beverages - oh yes, and in case we ever operate the layout formally there'll be a place to store throttles and paperwork and the like that isn't the surface of the railroad!
There's still some track laying left to complete - primarily on the two peninsulas - the shot below shows the CV yard in Richford - obviously it's awaiting roadbed and track!
The other thing I finished was a clinic on the layout that I just presented at the NMRA Mid-East Regional Convention in King of Prussia, Penn. For those keeping score, this is actually the second all new clinic I developed in the last 6 weeks - I'm hoping that this one will be a layout progress clinic that I can regularly update. I'd like to get as much mileage out of this as possible! 
The clinic was well received despite the 10 o'clock start time (that's 10pm!) and some issues getting my computer to talk to the projector. 


Tuesday, September 24, 2019

Progress?

The only way to finish a project like fascia is to keep
plugging away at it one piece at a time. 
The clinic at MARPM seemed pretty well received - and I was pleasantly surprised at the number of people in the audience - especially when the show organizers saw fit to put me on opposite Paul Dolkos for both of my "performances" <g>!
Frankly prepping the clinic meant all kinds of half-finished (half started) projects now litter the modeling desk. 
And, preparing for the clinic meant there was virtually no progress on the layout itself for the last month and a half. 
I really need to focus on my next clinic, which will be a layout status report/update at the upcoming MER (Mid-Atlantic Region of the NMRA) Convention in mid-October. 
But first, one thing I'd really like to get completed sooner rather than later is the "woodworking" phase of construction. To that end I spend some time Sunday and the last two evenings away from the modeling desk and the computer and have been making sawdust. 
The only benchwork and fascia remaining at this point are the Richford peninsula. The basic L-girders and joists are in installed - meaning I have to mark and jigsaw the subroadbed, attach all that to risers, and install the fascia. 
I think I can get those done by the end of next weekend. I might even manage to get a coat or two of paint on the fascia. 
Once the heavy sawing is done I can at last thoroughly clean the utility room area which has served as the "sawmill" for the last six months or so. Truth be told, I'm looking forward to getting that place cleaned up almost as much as getting the benchwork finished!

Tuesday, August 6, 2019

Status Report - End of July 2019

Layout Video Update for July 2019 can be found HERE

Unfortunately a lot more went on UNDER the layout than on top, entirely necessary of course but hardly photogenic! But here's a quick rundown:

1. All the track on the outer "loop," including all sidings and spurs (with the exception of the bridge and swing bridge) are complete. That's track down, wired, tested, and debugged.

2. Started laying out the track "full size" on the paper mill peninsula (I'm considering calling this area "Stafford Mills" since there's one too many "Sheldon <fill in blank>" on the layout. Someone mentioned that might confuse operators. I think it might since it confuses me.
You'll find Stafford Mills was the location of the paper mill complex on the original Southern New England (see MRP 2000). Besides, I came up with the name Stafford Mills for my first "real" model railroad back when I was in high school. I liked it then and I liked it now. 

3. Continued with creating a realistic, and visually appealing, composition for the Enosburg Falls section. I sketched, and re-sketched some of the streets a half dozen times, but I think it's finally taking shape.

4. I didn't do a great of bench modeling this month, but I did finally finish this structure - Ben Thresher's Mill. You might remember it from the previous SNE layout in its unfinished state. I still don't quite know where (or if) it will find a home on this layout - at the very least I'm going to build a small diorama and install the mill pond and damn.

I'm on the docket to do a couple of clinics this fall. The first will be at the Mid-Atlantic Railroad Prototype Modelers Meet (MARPM) in September. The second will be at the Mid-East Region, NMRA Convention outside Philadelphia in October.





Wednesday, May 29, 2019

Video Update #3

I've been pretty busy working on the layout for the last few weeks - you can see the progress in the latest video update I've posted to my "CVSNE" You Tube channel - 

Or you could simply click the link HERE 

Thursday, June 28, 2018

Layout Update #1a

I've been busy working on the layout over the last week or so - although it doesn't feel like model railroading. Actually, doesn't feel a whole lot different than the painting we've been doing in other parts of the house. 
But all the IKEA leg sections have gotten two coats of paint, the shelves have been stained and varnished and most of those components are in the basement awaiting assembly. 
I also have some IKEA cabinets - those have gotten a coat of wood prep. 
On the docket for this evening is sanding the cabinets and getting a coat of paint on them. 
I've also worked up a benchwork plan and plan to start construction sometime over the July 4th week which promises to be a little slow at the office.