Sunday, August 19, 2012

August 19, 2012 Work Session Report

Good work session on the railroad this afternoon meant an early start to the new "model railroad season." I'm hoping to get the railroad somewhat operational in the next couple of months - thanks to the good friends who are willing to help it just may happen. 
Paul Dolkos and John Paganoni were the first to arrive - after discussing the lighting situation over the main peninsula (long story short - a better lighting solution is now a top priority) Paul got work ballasting the track in Waterbury. This track is in place and "finished" - which means it's been tested so I feel confident it's ready for ballast. 
Stic Harris arrived next. After the obligatory tour of the railroad, Stic got to work gluing down some ties for the last two turnouts in Essex Junction - while waiting for the ties to dry he cut up some pulpwood piles for the woodyard to be located on the end of the peninsula. 
John got busy filing up some switch frogs and points, and also got some measurements for the White River yardmasters desk - he'll build that at his house in his wood shop. 
Ben Hom opened up the rip track and managed to give all the cars currently on the railroad the once over - checking car weights, coupler height and operation, wheelsets, etc . . . He really plowed through the car fleet - we'll have to have him over again  . . . 


Bernie arrived later than the others and showed my son Matt how to assemble the Alkem C&O Signal Bridge kit (Matt is doing some contract assembly work for Bernie) and then made some repairs and touch up painting to the WRJ coaling tower. That's great, since I need to get it installed on the layout!


Finally, I took the opportunity to review the plan for the industries in Everett (named after a college classmate who was upset when he learned I named the river crossing after another classmate . . .) Looks like we'll be adding a coal dealer and a team track to the scene in Everett. 
All in a great day. 

Thanks to all for the help!

Thursday, July 19, 2012

Major Milestone - 30,000 page views!

As of this evening, the blog has exceeded 30,000 page views. Thanks to all who take a few minutes to look over this blog. I hope you find something of use here, and I appreciate all the links to the blog, feedback from readers and emails!

Tuesday, July 17, 2012

Essex Junction Trackwork - Update

Rather than overcomplicating things, I decided to go with a very simple homemade spring to hold the points on my hand laid turnouts. As you can see from the photos, the spring is a piece of .028" brass wire bent to a 90-degree angle with two "legs" bent downward. These legs are inserted in holes drilled in the throw bar and an adjoining tie. 
Once the turnout is finished, painted, weathered, and ballasted, I think it will be virtually invisible. If I want to take a realistic photo of the scene at some point it's a simple matter to remove the spring and replace it once the pictures have been taken. 
Thanks to all who commented with suggestions - the "spring" you see here is actually the result of some experimentation over the last couple of nights. I'm pleased with how well it works. Sometimes the simplest solutions are the best. 

Possible shelf model?

I have a couple of HO scale models on display in my office. And my-coworkers and our clients who regularly visit our offices always comment on them - usually there's a story about someone or another (or them) who had a Lionel train. But I've uncovered one or two "real" model railroaders in the process. 
But let's face it, even the nicest HO scale model sitting on a shelf lacks, well, "presence." 
I'm thinking maybe an O scale model would be a better choice. 
I found that Mullet Scale Model Works makes an O scale Central Vermont three-window caboose. One neat thing about their models is the way the steel components on the prototype are modeled in brass, and the wood parts are laser cut wood. A neat approach. 
I may have to build me one of these. 

Thursday, July 5, 2012

Layout Work Sessions - Beneficial or Too much like, well, work?

I've had several local modelers volunteer to come over and help with various aspects of the layout. Several have indicated they would be willing to stop by and help next time I have a "work session." 
While I appreciate the gesture, and have certainly accepted help on the railroad from time to time from friends, I've been a little hesitant to declare "Every other Tuesday night" or whatever is a work session and invite a half dozen people over to work on the railroad. I seem to do okay with one or two folks at a time.  I also do okay when it's a group project - something like building benchwork comes to mind. Or it's something where I know the results will meet my vision (Bernie's backdrop painting, like that shown HERE, jumps to mind.)
My main hesitation stems from the fact that the few times I've had more than one person over to work on the layout I get really stressed out looking for tools, materials, and the like, answering the "is this what you wanted?" type questions, and all the rest. Frankly, it brings the hobby dangerously close to the kind of stuff I deal with all day at the office. And that doesn't sound like fun. 
But the whole process is fraught with peril of another sort. Someone might be the nicest guy in the world, but he's all thumbs when it comes to modeling - or certain aspects of modeling. Such things can easily lead to hurt feelings - "Gee, Bill, thanks for taking the time to make all those trees last work session. They looked like garbage . . . which is where you'll find them if you want them . . ." 
Hardly seems friendly. 
But I do know some modelers who manage to host what amounts to a private club in their homes - and they seem to get a fair amount accomplished. I'm not sure, but my guess is they know to play to each person's strength - and in some cases may find that honesty, even brutal honesty, is the best policy. And there's a clear understanding that "This is my layout, and if something doesn't meet my expectations I reserve the right to change it." 
Another key would be to have the "work assignments" in mind before everyone shows up at the door - and tell them what they will be working on and ask they bring their own tools. That would cut down a little on the need to spend an entire evening or afternoon rushing around the basement looking for all the tools and materials needed. 
Any thoughts for people who host, or attend work sessions? No need to mention specific names. 

Wednesday, July 4, 2012

Happy Independence Day!

Actively working on the layout (more track work - update coming soon!) and staying out of the summer heat - 

Hope all have a happy and safe 4th of July! 


Saturday, June 23, 2012

Farewell to yet another Waterbury landmark

Although the Waterbury Vermont station has been wonderfully restored the other buildings that once stood across the tracks haven't been so lucky. The first of these to disappear was the feed mill that was directly across the tracks from the station proper. Now, I understand from Bill Brigham and some of the other folks in Vermont that the former CV freight station is no more. The photo above was taken during a late winter safari with my friend Alan Irwin. Alan was a  dear friend - but he was a train chasing rail fan at heart and never really understood WHY I would stop and take pictures of buildings with nothing around them - especially in a dimly lit cold (and I mean cold) Sunday afternoon in early March. 
I'm glad I did. 
Here's a photo of the feed mill I took the same day. 
Of course, I plan to include these on the layout in the Waterbury scene, but at this point all that exists of the freight house is the footprint. (For the record, this is "full size" in HO scale):