I've been doing some additional research on the Missisquoi Pulp & Paper complex at Sheldon Springs. I've featured the mill complex in previous posts HERE and HERE.
I'd gotten as far as laying the track and wiring it on my freelanced ("inspired by") version of the mill. But I've learned enough about the prototype over the last couple of years that my version simply isn't cutting it. The result has is a complete scrapping - down to the open grid benchwork - of my initial attempt.
I'll share more about how this is shaping up in future blog posts.
In the meantime I wanted to share this Jack Delano photo (above) from the Library of Congress website.
This is obviously a second pulpwood handling station (a photo of the other one appeared in a Wordless Wednesday post HERE).
![]() |
| The sign next to the shed reads "Engines Must Not Pass This Point". |
Obviously I plan to include some version of this wood unloading station on my revised mill. But this photo actually makes me ask more questions than it answers.
For example, while the wood is obviously being delivered by boxcars (not surprising) I'm a little puzzled by the fact that pulp logs appear to have been debarked. The pulpwood pile is on the other side of the plant from the pulp mill itself - so how did the logs get from the pile to the mill proper?
By the way the reporting marks on the end of the boxcar are CN 511534, making this a member of a very large group of CN single sheathed boxcars. Sylvan and Steam Shack (F&C) both offered resin kits for these cars.
There's clearly an NY&OW gon in the photo linked above. Perhaps that is an ex-NYO&W gon that's being used to shuttle the pulpwood within the plant complex?
Luckily none of these questions need to be answered before I get the basic benchwork, track, and wiring complete in the mill complex.
And yes, that little speck in the lead photo atop the pulpwood pile is indeed an OSHA violation waiting to happen.... <g>!
Wednesday, February 23, 2022
Sunday, October 31, 2021
New siding for "Stafford Mills"
![]() |
| The fact that even the "first coat" of the backdrop painting stops here is a clue that the Stafford Mills area of the layout is unresolved. |
In this case I didn't have to remove anything so this wasn't so much a "rework" as it was an addition or an enhancement. I could even make the argument this didn't add any additional track to the layout since I'd removed a turnout and a siding from the junction area as part of the rework of that trackage I described a few months ago.
I was out of Micro Engineering no. 6 code 70 turnouts - as is everyone else. So I decided to handlay the necessary turnout. Although this added a couple of evenings to the project I'm glad I did - the turnout works perfectly, and cars and locomotives (even brass steam locomotives!) pass through both routes without so much as a click! I'm not wishing any additional work on myself, but if any of the Micro Engineering turnouts on the rest of the railroad fail or prove troublesome I'm simply going to replace them with handlaid ones.
The buildings shown in the photos are strictly placeholders and may, or may not, end up in these locations permanently. I kind of like the idea of a station in between the mill lead and mainline, so that will likely stay (I may build a different station for the spot. The one shown is a model of the Richmond, Vermont station - although that perhaps the closest to a "standard" CV small depot design as the railroad had. But there are a couple of Grand Trunk (NEL) stations I've always liked and may well scratchbuild one of those for this spot.
The freighthouse is a Walthers cheapo model that I painted and lettered in "close enough" CV colors. It's not bad .... but the weakest point is the platform - despite my best efforts it's still too bulky. I should have replaced it with a scratchbuilt wood one. I do have a BEST Trains kit that may work better in this spot, if I decide to stick with the freight house.
The red rectangular building is simply there to fill space and see how a larger industry would look in that spot. I'm not convinced it's going to work there - especially with the freight house. The answer is looking like (1) freight house and something that isn't a large building - a coal yard for example or team track OR (2) a larger building industry with no freight house. Since there's going to be plenty of large buildings in the mill complex I'm leaning towards option #1.
My ultimate plan for the area with inside the mainline curve (with the yellow building) is to ultimately have a mill river with one or two larger wooden mill structures over a mill stream, complete with mill falls, etc. ... But that sounds like it may take months/years to get completed. This may well simply end up as some open fields and a tree line "for now" to get a large portion of the landscape to look finished with the idea I could revisit it at some future point.
Tuesday, April 17, 2018
Sheldon Junction Bridge
![]() |
| Richford Local crossing Missisquoi River, John Krause photo |
![]() |
| Ian Stronach photo |
I've seen photos of the bridge - such as John Krause's photo above and Ian Stronach's photo shown to the right.
I figured the bridge looks close enough to the Central Valley Truss bridge that I'd simply order three of them and build them up.
But in the years since I've bought a bridge - or seriously looked at bridge kits - Central Valley has added to their product line by offering their "classic" bridge as an Eastern Gusseted or Punch Plate bridge. Great, knowing my luck I'll pick one of the three, guess wrong and find out only after it's installed on the railroad!
Google to the rescue.
Even the railroad tracks are long gone the Richford Branch right-of-way is still there - as a bike trail. And Google Maps
![]() |
| Google Street View of the Sheldon Springs bridge. |
A few quick clicks and I was able to determine the original Central Valley Pratt Truss bridge is the closest to the prototype. I was also able to use the map
to determine the length of the span - the Central Valley bridge is 150 feet long, meaning three spans measure 450 feet. Google Maps indicates the river is about 370 feet or so across - but that's today's bike trail - as shown in the John Krause photo above, the abutments weren't located on the edge of the river, meaning 450 feet or so should be close enough, and ought to make for an impressive scene.
Naturally, guess which version was nowhere to be found at Timomium last weekend!
Friday, June 30, 2017
Richford Branch Maps 3, Sheldon Springs
Typically the Richford freight required two engines for power. George Corey provided this shot of N-5-a 2-8-0 no. 466 shoving on the rear end of the Richford-bound freight at Sheldon Springs on February 23, 1957. Within a month steam would be dead on the CV. (And yes, freight car nuts should check out the GTW rebuilt boxcar ahead of the van).