I just uploaded a post to my Modeling Steam Era Freight Cars blog discussing the Prototype Junction crowd sourcing ATSF Bx-11 & 12 (and other railroads) project.
As these aren't directly related to the Central Vermont, but are most certainly steam era freight cars, figured I'd limit the post to that blog and simply post a link here.
https://steamerafreightcars.blogspot.com/2020/01/crowd-funding-ho-scale-models.html
Monday, January 27, 2020
Friday, January 17, 2020
Then and Now
Wednesday, January 15, 2020
Thursday, December 26, 2019
Images from videos
Back 20 or more years ago an outfit called A&R Productions produced a series of VHS tapes titled "Central Vermont Railway in Steam." I bought the video tapes, and then, several years later the same footage was re-released on DVD. These were essentially 8mm and "Super 8" movies shot in the last couple of years of steam on the CV - primarily on the Southern Division. As such, they're not terribly clear - there's lots of handheld camera work and quick cuts, but they often show things that I've never been able to locate anywhere else. Which brings us to the topic for today.
Video #3 is actually two parts - the majority of the first half of the video shows lots of switching in Palmer and Willimantic, and then shifts to a ride in the caboose up the Richford Branch. (The second half of volume #3 is a cab ride on the Willimantic sub in Connecticut).
I was going through some boxes a couple of weeks ago and came across the DVD - which I haven't looked at in a number of years. I went ahead and popped it into the DVD player to see if there was anything useful to me. In short, there was. I did a few "screen captures" with my iphone - they actually turned out fairly decent - considering this was a DVD remastered from a VHS that was sourced from 8mm home movie shot with a handheld camera on a caboose that was bouncing around quite a bit. I've mentioned the Richford plywood plant (which burned in 1954) before - this is the only color image (and one of only a few views of any type!) of that plant I've seen, ever...
Video #3 is actually two parts - the majority of the first half of the video shows lots of switching in Palmer and Willimantic, and then shifts to a ride in the caboose up the Richford Branch. (The second half of volume #3 is a cab ride on the Willimantic sub in Connecticut).
I was going through some boxes a couple of weeks ago and came across the DVD - which I haven't looked at in a number of years. I went ahead and popped it into the DVD player to see if there was anything useful to me. In short, there was. I did a few "screen captures" with my iphone - they actually turned out fairly decent - considering this was a DVD remastered from a VHS that was sourced from 8mm home movie shot with a handheld camera on a caboose that was bouncing around quite a bit. I've mentioned the Richford plywood plant (which burned in 1954) before - this is the only color image (and one of only a few views of any type!) of that plant I've seen, ever...
![]() |
| Atlas Plywood in Richford, shortly before it burned to the ground in October 1954. |
![]() |
| Approach into the CV's Richford Yard |
![]() |
| Another "only time I've seen a photo of ..." - the HP Hood Creamery in Richford. |
![]() |
| In Enosburg Falls, that's a coal dealer shed in the right foreground. |
![]() |
| Enosburg Falls - note how tight this area was. Basically east of Main Street, West of Plesant Street. Feed mill, with a "Wirthmore Feeds" sign atop the roof barely visible to the left. |
Monday, December 23, 2019
End of Year Progress Report
I'd mentioned in a previous post that we were having a holiday open house for our neighbors. Happy to report the event was a complete success. It's always interesting to see the reaction of non-modelers to a scale model railroad. A lot of people mentioned they'd expected to see a train around the tree, or perhaps a Christmas Garden* - instead when they came downstairs they saw, well, this....
Take this as an end-of-year report on the status of the Richford Branch.
The entire mainline "loop" is in place, including the swing bridge track. The photos show how it's constructed and how it works. Essentially, the swing gate surface slides beneath a piece of mdf that's secured to the plywood subroadbed with a gap between the underside of the MDF and the layout frame.
To date friction does a fine job holding the track in place. At some point we'll add some sort of locking mechanism and a perhaps an electrical interlock to kill power when the bridge is open.
The trains ran just fine over this bridge for more than 4 straight hours - so I consider the swing gate a complete success.
With the mainline in place and operating, I've turned my attention to the two peninsulas - the papermill peninsula and the Richford peninsula.
After playing around with flextrack for an afternoon, it became obvious the paper mill
peninsula would benefit from a handlaid turnout or two. Besides, I continue to have issues with ME turnouts, meaning I might be handlaying all the turnouts on the two peninsulas.
I also have been laying out the track for the Richford yard. But that deserves it's own blog post.
![]() |
| I placed the cannery in the front entrance area. The structures, such as the barn in the background and the various buildings visible in the previous photo, are stand-ins. |
![]() |
| The stationary end of the swing gate showing the slot the gate slides into. |
![]() |
| Action shot! The end of the swing gate. Note the paint scrapes indicating the friction lock. |
![]() |
| Closed position. I soldered the rail to some PC board ties on both the gate and the layout to help keep the rails aligned. |
With the mainline in place and operating, I've turned my attention to the two peninsulas - the papermill peninsula and the Richford peninsula.
![]() |
| A set of Fast Tracks twist ties glued to a piece of 1/8" plywood to form the lead into the paper mill yard. |
peninsula would benefit from a handlaid turnout or two. Besides, I continue to have issues with ME turnouts, meaning I might be handlaying all the turnouts on the two peninsulas.
I also have been laying out the track for the Richford yard. But that deserves it's own blog post.
Friday, December 20, 2019
Nine Years of Blogging
December 17th marks the ninth anniversary of this blog. In keeping with what has become a blog anniversary tradition, here are a few numbers, going back to December 2012 (first month I actually took notice of these statistics!).
I started this blog to create a diary of sorts that would document the building, rebuilding and operating my home layout. I did take a break from the blog between January-May of this year, but have resumed in the last few months.
One thing I did this year was resume video updates on the layout. I didn't do one for November, but managed to record a November/December update that I hope to get edited and posted this week.
I'm surprised, thrilled, and more than a little humbled at how many people following (and I hope enjoy!) my little corner of the model railroad internet.
As of today, there's a total of 719,448 unique page views!
Based on the typical number of reads per year, I don't think the blog will crack the million view mark in 2020, but you never know!
The top all time posts** are shown below:
* There are no stats available for the first year since I didn't include them in the first anniversary post! I also didn't do a "End of 2018" Anniversary post for some reason.
** Of course, by including the list of Top Ten posts and associated links here all I've done is guaranteed people will click on them, increasing their total views more!!
I started this blog to create a diary of sorts that would document the building, rebuilding and operating my home layout. I did take a break from the blog between January-May of this year, but have resumed in the last few months.
One thing I did this year was resume video updates on the layout. I didn't do one for November, but managed to record a November/December update that I hope to get edited and posted this week.
I'm surprised, thrilled, and more than a little humbled at how many people following (and I hope enjoy!) my little corner of the model railroad internet.
As of today, there's a total of 719,448 unique page views!
Based on the typical number of reads per year, I don't think the blog will crack the million view mark in 2020, but you never know!
The top all time posts** are shown below:
* There are no stats available for the first year since I didn't include them in the first anniversary post! I also didn't do a "End of 2018" Anniversary post for some reason.
** Of course, by including the list of Top Ten posts and associated links here all I've done is guaranteed people will click on them, increasing their total views more!!
Wednesday, December 11, 2019
Subscribe to:
Posts (Atom)


















