Sunday, June 4, 2017

Status Report - 3 June 2017

After a long day in the basement, disassembly of the peninsula is complete. Next step is getting the remnants upstairs and out to the garage. 
The massive amount of wood currently leaning against the walls and piled on the floor present the perfect argument for smaller, simpler layouts! 
Ugh, none of this was any fun, but having a good friend over to help at least made it seem to go a little faster! And we did enjoy a nice lunch trackside in Old Town Manassas - where we discussed plans for the next railroad! 
Thanks Stic!

Thursday, June 1, 2017

Lessons Learned


An important lesson all sailors learn in bootcamp - ways to stop water from getting into the people tank.
Lessons Learned are a big thing in my work life.  We’re perpetually looking at things that didn’t go as planned (and even those that did) in an effort to identify and repeat the things that worked and to avoid repeating those times, as one of my old bosses was fond of saying “The water got into the people tank.”*
So, although I was pleased with the layout’s scenery and performance (once the initial teething pains were worked through) I find myself asking if the layout was “successful?”
The stated purpose of the railroad was to “model the equipment, structures, operations and setting of the Central Vermont Railway in the late steam-to-diesel transition era.” 
Measured against that standard, I’m not sure the railroad didn't fall short.
Here's just a few of the lessons learned:
Focus: I need more of it, and I need to stick with something once I drive the stake in the ground. "Modeling the Central Vermont of the 1950s..." is a large canvas. As I've relayed in this blog, I started modeling the Southern Division of the railroad on a double deck layout, then tried to shoehorn White River Junction and the Northern Division (with it's larger engines) into a single-deck railroad, only to later remove WRJ and install Essex in its place. The basic footprint of the layout never really changed all that much, but I think we built, and rebuilt, every section of the layout at least twice. 
My approach to layout design?

In essence, I was chasing the ever illusive squirrel - the hope of a "perfect" layout design to overlay on my theme. In the end, "perfection" became the enemy of decisiveness. That's all on me, and I truly appreciate the grace and tolerance shown by my friends throughout all this! 


Modeling the Operations:  In general, the individual operating sessions were a success (I always had a good time).  But let’s look at it from the viewpoint of return on investment.
I started construction of the layout in December, 2008.  It took several years of building (and yes, rebuilding) the layout.  In total, I ended up hosting 17 “official” operating sessions throughout the railroad’s 8.5 years of existence.  That’s averages out to a session about every 7 months.  An aside, if you really want to depress yourself, consider the following formula:
Total Cost of the Layout (in $) / Total # of Sessions = Cost/per session ($) 
No matter how it's broken down, it doesn’t seem like the time, effort, and money to build the layout was worth it when you consider the total time spent performing its main function was a fraction of the time it existed.
We didn't operate as much as I'd hoped, but Christine made sure no one left hungry!
Modeling the Equipment:  It’s great fun to tell yourself you’re going to model the railroad’s operations, six or seven towns, complete with scratchbuilt replicas of all the buildings, and run through them trains populated by accurate, detailed cars pulled by equally accurately detailed locomotives.
If you asked me what my favorite part of the hobby is I’d tell you it's building detailed freight cars. 
The one resin car I've gotten built in the last 24 months...and it's not even lettered yet!
If that's the case then why I have gotten exactly one – that’s one – resin car kit built in the last two years?
 Instead of doing what I wanted to do when I wanted to do it, I’ve been stuck in a do-loop of sorts - “feeding the monster” – that large layout looming in the basement that required track, wiring, static grass, structures, trees (my God, the trees!), in massive quantities.  I kept telling myself I’d get the thing to “looking finished” and then turn my attention to the projects I wanted to work on.  But there was always another bunch of trees to install – or some piece of track to ballast.
I'll conclude with this. I'm not "down" on large layouts. I'm also not "down" on small layouts, or anything really. I don't think  the layout was an absolute failure. I had fun, shared some good times with friends, perfected some techniques and learned a lot about myself. My purpose in writing this is not discourage anyone else from pursuing their approach to the hobby (Lord knows, the above isn’t going to encourage anyone to do anything other than take up knitting!). Instead, I'm trying to quantify the good and bad and hopefully apply those lessons learned to the next railroad. 
 *To get the joke it helps to understand he was a submariner. And the #1 rule of all submariners is to keep the water out of the people tank…(Hey, it’s not my line, submariners are weird, everyone knows it.)

Layout Tear Down Status Report - As of 1 June 2017


Hope all took some time to reflect over the past weekend on what the holiday is really about.

Thanks to a (seemingly) never-ending string of rain storms passing through the area I've not yet started on my deck staining chore.  I did turn my attention to starting removal of the layout from the basement. Currently, the "barn curve" - a scene that I think came out pretty well, is sitting in the garage in 5 or 6 pieces awaiting a trip to the landfill.

Attempts to part out sections or pieces of the layout, even interest in basic components like 1 x 4s and the like, have fallen on deaf ears, or became too difficult to coordinate (I can't store this stuff indefinitely waiting for someone to come out and decide if they want to take any of it or not!). So, I opted to make it easy on myself and, once the layout scraps are in the garage, everything will go to the dump.

In addition to the lobe end of the peninsula I've started removing the around-the-walls sections of the benchwork. The rest of the peninsula, which involves removing the backdrop and supporting structure, will wait until the weekend when I have some additional hands available. I expect the basement will be devoid of model railroad by the middle of next week.

On the positive side I've been doing more sketching and thinking about the next layout (hey, it makes the drudgery of tear out seem like hobby time, I guess!). I'm still leaning - very hard - towards the Richford Branch theme. Some have expressed concern that this would be "too limiting" and not offer enough variety, require enough operators, or otherwise wouldn't be worth the effort. I do see the point, but in my mind, these limitations are precisely what makes it appealing. 

Sunday, May 28, 2017

Dismantling commenced

From this:


To this:
Total elapsed time, about two hours. 
Because of how it was built, and rebuilt, this area had some of the most "complex" benchwork. I think taking the rest of the layout out will go even faster. 
They always come out A LOT faster than they go in....
Thinking about the next layout makes the process a little easier. 




Saturday, May 27, 2017

Richford Branch Maps - 2, Sheldon Junction, Vt.

We continue our trip up the Richford Branch with the location many consider the scenic highlight of the line - the bridge crossing the Missisquoi River in Sheldon Junction. This is milepost 10.11 on the line, measured from St. Albans. 
The word "Junction" in the name gives a hint as to the other key element of this scene, the CV's crossing with the St. Johnsbury & Lake Champlain RR, Vermont's famed "Covered Bridge" railroad. 
Again, this map was drawn using photos, valuation maps, and the railroad's engineering department drawings. 
(Click on the map to enlarge it. 



Thursday, May 18, 2017

Layout tear-down update

Thanks to all who have written individually or posted to the blog. I've been in the middle of a big project at work, and moving is well, all consuming, so I haven't been able to respond to all the notes, posts, comments, etc... Here's a quick rundown on where this project currently sits:
- The layout is still in place, but not for much longer. Thanks to my folks visiting last weekend and looking to help, the railroad is now devoid of trees ... most of the fall trees have been packed away for possible reuse. My dad proved to be quite the logger....


- Monday my folks helped me pack up my workshop - so the lathe, milling machine, scratchbuilding material etc... are all boxed up and ready to go into temporary storage. First, I have to haul all those (heavy) boxes upstairs!
- Over the course of the last couple of weeks of evenings I managed to pack up all the all the cars, locomotives, and structures, etc...
- All the salvageable track (ie. any track without ballast) has been removed from the layout. Any pieces of code 70 track longer than 2 feet have been bundled and packed away. All others bits and pieces of track, broken turnouts, etc...went to the curb. 
Next step will be the worst - removing the layout framework itself. That's on the docket for next couple of weekends...