Monday, December 12, 2011

Backdrop Video Trailer



Coming This Holiday Season . . . from Dog Butt Films, in conjunction with Leaping Hound Productions ....

Friday, December 9, 2011

December 8 Work Session

Good work session this evening on the Central Vermont Winooski Sub.  Bernie braved the DC traffic to come out to Manassas for a Friday night session. I worked on roadbed in Essex Junction while he painted a late fall backdrop behind Waterbury.  I won't bore anyone with photos of roadbed - but the backdrop Bernie painted came out pretty sharp.

We did shoot a couple of short videos showing Bernie at work - I will post those later. 

We found some pictures in Morning Sun's Central Vermont Railway in Color for inspiration. One of the most recognizable items in the Vermont landscape is "Camel's Hump" - the second tallest peak in the state but one with a unique profile (hence the name). Bernie used a photo taken by my good friend Alan Irwin as a guide - Alan's picture is in the lower right in the open book. 
In the image below you can see the unique shape of Camel's Hump - but Bernie was careful to not make shape TOO distinctive since the backdrop would look odd when viewed from a different angle. Looks like there is already snow on the peak - it won't be long before Waterbury will be buried in the white stuff .  . . maybe we need to run a couple of ski trains?


Along the narrow "neck" of the peninsula, Bernie added some "foreground" tree detail to my already outstanding backdrop painting efforts! (Actually, I think he "tweaked" my trees more than a little). The Supertree in the center is there as a height reference. One thing that has become obvious is I need more light on this section of the railroad. We discussed some possibilities for that as well. 
I couldn't resist setting up a simple "test shot" in Waterbury. I want to finish up the work on the track in Essex Junction - but I also really, really, want to get to work on the "front door" Waterbury scene. 

Thanks for the help, Bernie!





Monday, December 5, 2011

Garden State Road Trip


Naturally I had to kick off the trip report with some CV RS-11s!

St Johnsbury, Vt., on Mike McNamara's HO railroad. 
Just back from an enjoyable weekend tour through the New Jersey countryside with Bernie Kempinski.  We started out early Saturday morning, heading north towards the Garden State. After paying homage to the governors of both Maryland and Delaware (it takes about 15 minutes and $9 to get through Delaware – Maryland is almost as expensive but at least you’re in the state longer) we arrived at Mike McNamara’s “Northeast Kingdom” HO layout.  Mike models the railroads in an around St. Johnsbury, Vt., in 1980.  Lots of colorful engines and freight cars.  Mike was a great host and we had a good time looking at his layout, taking some pictures, and shooting some videos of trains in action. 


After lunch – at a local pizza joint, where surprisingly no one was named “Tony” (for the record, we did ask . . .) we headed north.  Lola, the GPS in my wife’s Honda Accord, decided to take us on a circular tour through downtown Princeton – but at least we saw a horse in the middle of the road. 

When we arrived in Newton we checked into the hotel and Tony Koester picked us up and took us on a tour through the northern New Jersey countryside.  Tony pointed out all the old railroad archaeological artifacts and abandoned right-of-way.  It was very interesting, but difficult to see in the dark. 

From L to R: Bernie, Perry Squier, and Tony Koester. 
The St. Mary's Penn., scene on Perry's P&S is a great example
of prototype modeling. 
We stopped first at Perry Squier’s house.  After meeting “Richie” – a rather large (and hungry) horse, we went to the basement to look at Perry’s Pittsburg & Shawmut.  Set in 1923 this is a very nicely done coal-hauling railroad in the mountains of Pennsylvania.  I especially liked Perry’s signature scene of St. Mary’s Penn.  I also think Perry has done a wonderful job modeling what many consider the “Golden Age” of railroading – the era just before the “super power steam” of the early 1920s. 

I really liked how Perry's layout fit the space. 
From Perry’s we headed to Ted Pamprin’s Chesapeake & Ohio.  Set deep in the New River Gorge in West Virginia I especially wanted to see for myself how Ted’s leafless trees look in person when covering a large mountainside.  I’m happy to report they look just fine. Ted had some great tips on landform modeling, including using leveling sand, secured with this thin adhesive, for basic ground cover.  Neat layout – his Thurmond, W.V. scene is right on – and looks great. 

Ted Pamprin's HO Chesapeake & Ohio New River Sub. 
Ted's Supertree-filled mountainsides look great!
A look at Thurmond, W. Va. 
After a very nice dinner (although the wait was so long Bernie was able to do an impromptu version of his USMRR clinic on his iPad while we waited in the bar!) we headed over to Tony’s for an tour/indoctrination on his Nickel Plate.  This is a BIG layout – having edited the article on the track plan back in my MR days this was the first time I’d seen the layout basically in place (I visited Tony a few years ago before he had finished most of the basic infrastructure.  The NKP Clover Leaf is a big project – very impressive. I’d classify it as “industrial strength” model railroading – everything  – locomotives, throttles, freight cars, wheelsets, etc . . . has to be done in bulk.  It’s really quite a project, and I admire Tony for his dedication to bring his favorite railroad to life in his basement, and appreciate the chance to operate on it - I had a great time.   

Go faster, Bernie, this is supposed to
be a "Fast Freight" route!
Frankfort Yard on Tony's NKP.
Yes, this yard is 60 feet long!











While we completely enjoyed the operating session, I, for one, left secure in the knowledge that style of layout was just not right – for me, anyway.  Seeing Mike’s, Perry’s, and Ted’s layouts confirmed, to me at least, that I really prefer the single deck layout arranged with a “panoramic” view over the multi-deck, long mainline at the expense of all else approach.  I felt completely vindicated in my decision to remove the upper deck from my own railroad.  I’m also continually tempted by an earlier era than I presently model – then I realize how much inventory I have on hand and think I should stick with the 1940s/50s era. 

Overall, a great trip that left us motivated to work on our own railroads. Now that I have a few weeks at home, the weather is cold outside, the days are short, and it’s time to get something done on the Central Vermont! 

Friday, December 2, 2011

Planning Essex Junction


I have been spending an hour or so a night for the last couple of weeks planning, and re-planning, the Essex Junction scene. 
I’m happy to report these efforts are starting to pay off. 
This scene and I go way back. The first layout I started building as an adult (when I determined the CV in the steam era was right for me) featured the Essex Junction scene. That one never got past the benchwork stage.  The second time I modeled it was in N scale on a small layout I built in a rented townhome when I was on the MR staff. That scene led to an article on Essex Junction that appeared in Model Railroad Planning
It's finally time to do this scene again - this go 'round will be HO scale. 
Essex Junction is, in reality, two different “scenes.”  The first, and most recognizable, is the area around the trainshed itself.  Here’s a familiar view of the trainshed. 
 The second, much less familiar scene was area around the wye, just a couple of blocks south of the trainshed.  It was rarely, if ever photographed – at least in its entirety.  One photo showing the wye is this very early image: 
Using CV engineering department drawings and Sanborn Maps this map shows the track and most of the industries in, and around, Essex Junction in the early 1950s. 
On the layout, I’m taking the approach of making whatever compromises I need to make to have the trainshed look as much like the pictures as possible, even if it means I have to “tweak” the wye scene slightly.  Perhaps the biggest compromise I made was to flip the location of the wye and trainshed, relative to the other modeled towns on the layout.  Coming north from Waterbury (on the layout, around the bend on the peninsula) a train should go through the wye and then past the shed on its way north to St. Albans.  On my layout the train will go through the shed and then the wye.  If I maintained the prototype elements in their correct orientation, the track would curve in the “wrong” direction relative to the most commonly photographed view of the scene.  I felt it was important to capture this angle for the trainshed scene to look right, even if it meant flipping the relative location of the shed and wye.  Besides, when I mocked up the scene with the elements in the “right” place there was little room for the wye trackage. The shape of the basement dictated the placement I’m using. 
Due to the configuration of the layout and the basement, I can also add a live third leg of the wye to serve as a live interchange track representing the Burlington branch.  This same track will also permit me to reverse trains between sessions by backing them over from the north end staging yard. 
I suppose there are some who would be bothered to no end by the compromises I’ve made on this scene.  I think the finished scene will look like Essex Junction, even if the individual elements are not arranged exactly like the prototype. 

Wednesday, November 2, 2011

Trip Report - MER 2011 Convention, Cary, NC

I rolled back into town Sunday evening after spending a very enjoyable three days at the NMRA Mid East Regional Convention in Cary, NC. Model railroad conventions can run hot or cold, and I've been to plenty of regional conventions over the years - and frankly some of them have been awful. But not this one. 

First of all, the show went off without a hitch - the hotel (Embassy Suites) was excellent - even the food in the on-site restaurant was pretty good and reasonably priced. The clinic lineup was outstanding - they ran four rooms from 8:00 until 11:00 pm for three days - quite a feat! the weather on the drive down was great, but by Friday the skies had clouded over and it was pretty windy and rainy so I stayed inside most of Friday.  Judging from the audience size in the clinic rooms so did most of the other attendees! 

Bruce DeYoung gave two excellent clinics - one of slate roofs and the other on "Modeling tricks and tips" - here's Bruce showing one of his tips - a great way to spread ballast:

Danial Fisher is a structural engineer who specializes in steel-framed buildings. He gave an "extra fare" clinic on modeling steel framed structures. For $12 I got a GREAT handout and a small kit to build a steel-frame shed (or addition to an older building. Dan displayed this model, which is a Walther's Car shop with complete framing and bracing added to represent a steel-framed building with brick curtain walls. Sorry for the quality of these photos - I took them with my iPhone in the clinic room! Apparently, Dan's factory manufactures droids!:
I did get out of the hotel for a little while. I had lunch with Mike Brestel and John Roberts on Saturday, and then headed over to check out Bruce Faulkner's N scale CSX layout. To give some sense of this project, Bruce's layout is about the same size as mine but is double-deck in N scale. He has a CTC signaling system installed, but is only now really starting to make progress on the scenery. It looks like a great railroad to operate and I may need to get a few of the locals from this area to make it our next operating road trip. 
Here's Bruce:
And here's a view of his main classification yard:

All in an all, an excellent weekend seeing old friends and making new ones!









Sunday, October 2, 2011

Stand-in Vermonter

I ran across this USRA Light 4-8-2 lettered for the Southern New England Ry. the other day and decided to see how a passenger train would look on the bridge. This is a "Stand-in" for the CV's Vermonter - my plan is to run it on the layout with a CV RS-3, but that's another project that's not done yet!

I liked the picture (which was literally a "grab shot" with my iPhone!) so much I thought I'd post it here. 

Monday, September 19, 2011

Open house!

We had about 40 local NMRA members come by and visit over four hours 
during the open house Saturday. I enjoyed having a chance to see old friends, and make new ones and got a kick out of seeing the reaction to some of my rather unusual construction methods. 
      The layout performed well without any issues - I was really pleased especially considering how "temporary" some of the wiring is at this point! I actually laid some track the in the morning and wired it in time for the open house!  I really shouldn't have done that, but I wanted to be able to run the entire length of both sides of the peninsula. I had a list of 10 things I wanted to get done for the open house - issues with one turnout cost me more than a day of troubleshooting which blew the timeline so I didn't get the fascia painted (item no. 10). I considered painting it on Saturday morning, but cooler heads prevailed when I had visions of visitors leaving with splotches of fascia color on their clothes!
Jeff McGuirk (in bright green shirt) chats with Potomac Division members
at the September 17 open house. 
     Jeff (my oldest son, in the green shirt in the photo) came up from Virginia Beach for this event. He helped clean up before the open house and was a great help during the proceedings - he mostly ran the trains and I talked, and talked, and talked. Which apparently isn't really a problem for me . . .
     Everyone who saw the previous layout footprint found the new arrangement to be a real improvement. I'd estimate we had as many as 25 people in the basement at one point. It seemed cramped but not overly crowded - of course I'll never have half that number for an op session. But I concluded the day secure in the knowledge that 8-12 member crew will be very comfortable in the space.
     I reviewed some options for the mill stream arrangement with a few folks, including Dave Emery who's an expert on New England mills. We did come up with a workable arrangement for the Lamson & Goodnow kit but I'm still considering using the Atlas Middlesex building since it seems a little larger, more modern, and might fit the space better.
     I also talked through some decisions that need to be made for the "yard" area - which is still an expanse of open benchwork. Stay tuned to this blog for more details on how that area will shape up in the next few months. 
     The decision to change the layout has been worth the blood and sweat to pull it off. Since the entire layout is actually cleared off I should take a series of pictures as a "walking" tour (Dave showed me some cool pics he took with his "extreme wide angle" setting) and record what it looks like at this point - about nine months to the day after I started construction!