Just uploaded a new video update to YouTube. You can find it HERE
![]() |
| The Richford Turn leaves Enosburg enroute for Richford during Session #1. |
The occasion was operating session 1.0 on the Richford Branch.
I invited three good friends over to put the layout through its paces. I was concerned there wouldn't be enough to do to keep them entertained and occupied, but was pleasantly surprised to find that wasn't the case. In the end the layout supported an enjoyable, low key session for three operators and could have handled a fourth operator if only there had been another throttle available.
Operating the layout solo over the last couple of years revealed that working the town of Richford itself can easily consume an hour or so - the paper mill another hour or so - meaning it might take the branchline local 4 hours+ to finish its run over the entire layout. 
Bernie ponders his next move with the mill job.
My original intention for this session was to have two trains, each with a two-person crew - one working the paper mill job, the other running the branchline local around the rest of the layout. But that would still require the branchline local to work Richford yard.
So we tried something different and created a Richford yard job that spotted and sorted the cars for the local when it pulled into town. Not entirely prototypical for my era, (it was done that way in earlier eras) but it worked out really well. 
Todd brings the Richford Turn into Richford as Bill looks on.
It worked out so well I think we'll stick with this lineup for the foreseeable future:
1. Richford Turn (the branchline local)
2. The Mill Job - works the paper mill
3. Richford Yard Job
4. The Charlton Turn - works the "northern SNE" section of the railroad.
We also discussed the possibility of breaking the milk cars into a separate train. Depending on how many people we have I might try doing that next time. The Richford Turn has a lot of do as it is, and shifting the milk traffic to its own train may prove an ideal solution.
There were no issues with anyone feeling cramped or crowded - a function of mostly 3+ foot aisles in many places. That also means I can accommodate more operators by going to two-person crews in case, for example, a group of people come from out of town to operate.
That covers number of trains and operators - but did the layout offer sufficient play value? I was somewhat concerned people would find it boring to operate, they would be done in 15 minutes and wondering what they were supposed to do the rest of the day.
In the end I didn't need to worry - the layout kept us busy for the better part of 2.5 hours. And everyone finished about the same time.
How did the layout perform?
In short, there were a couple of little glitches, but nothing overwhelming. Likely since I’ve been running the layout on and off for a few years.
A few gremlins did raise their heads - nothing horrible but enough to need some attention.
For example, I'm going to fix (ie, replace!) a turnout in Berkshire that just doesn’t want to cooperate. And Todd managed to find the one spur where the feeders were loose (or not there!) so I need to deal with that. And the track in Charlton needs a good cleaning.
The only other “issues” were one or two cars with coupler issues. I put them aside and will deal with them before they go back on the railroad.
The only other thing I need to deal with is upgrading some of the operator aides - apparently my handwriting hasn’t improved since grade school!
All in all a great time was had by all - thanks to Stic for all his help getting us to this point (unfortunately he was out of town so he missed this one) and to Bernie, Bill, and Todd for bringing the Richford Branch to life!
And I posted a new video update on the layout, that shows some of the progress on a couple of structures and provides a hot wash of the operating session #1. You can find that on You Tube at:
You can find the video here:
I recorded and posted a quick video update - and then got distracted by the holidays and forgot to provide a link to the video here!
At this point I'm sure most everyone who's interested has found this thing, but in case you missed it, here's a link to the video on You Tube:
Apparently you can also get directly to my YouTube channel by searching for @cvsne678.
Enjoy, and Happy New Year!
Posted a video update HERE on the Forced Perspective scene. In this video I cover how to blend rivers into the backdrop and the process of creating realistic landforms out of foam.
Enjoy!
In the meantime here's a seriously zoomed in photo of the covered bridge mentioned in the video. Started working on ground texture and planting trees. This is really hard to reach (I knew that going in!) - frankly I should have done the scenic textures on the workbench and then positioned them on the layout. Live and learn!
I've just posted (finally!) a tour of the layout. The video is basically a walking tour of the layout as it currently exists - with some train running thrown in for fun!
Here's a link to the video:
![]() |
| Why I didn't add backdrops (other than the room walls) to my layout can be summarized by this photo. |
Essentially, the email questioned why I didn't include backdrops along behind both peninsulas and behind the "front" section of the layout where the Enosburg Falls and "Junction" scenes are located. An earlier view of the layout from the front "viewing aisle" is shown below for reference:

There's a couple of reasons I didn't include backdrops on those sections of the layout. In no particular order they are:
1. One of the toughest things to deal with in model photography and videography are shadows reflected from the 3-d world onto the 2-d wall, which is supposed to represent sky. Last time I checked, the sky outside my window doesn't reflect anything.Adding more backdrops is simply adding more walls - creating more distracting shadows that have to be addressed.
2. Somewhat related to #1 is the issues with lighting that additional backdrops would introduce. If there's one area where we model railroaders really need to focus it's on thinking through and improving layout room lighting. I really failed in this area on my previous layout, and although I feel the current layout room lighting is better, it's far short of ideal.
More backdrops means more light is getting blocked from reaching the layout - the solution of just adding more light fixtures in the hope the problem goes away only goes so far!
3. Multiple peninsulas broken up with backdrops may help create a sense of isolation and distance - and if that's the goal that's fine. But such a benchwork footprint usually means narrow shelves (a few inches on each side of the track has been promoted by some) which may serve the purpose of stretching the mainline length but at the expense of visual impact. The only photo angle available is the "extreme 3/4 wedge shot." Worse than that, when viewing the layout in person you will find it a struggle to achieve the sense of a train in the environment - it usually looks like exactly what it is - a model train running along a narrow shelf with a modicum of scenery on each side.
| The 3/4 wedgie view of a train - you better like this perspective - a lot - unless you include some deeper scenes somewhere on your layout. |
I realized that I haven't posted an update since just after Christmas. Yikes! time flies when you're (not) having fun!!
Frankly the first two weeks of January I was simply too depressed to head into the basement and do anything but binge watch Netflix shows on Formula One racing and a sci-fi action series called "The Expanse."
Then Chrissy came home one day and announced someone at her office had tested positive for Covid-19. She had a cough at the time, so figured she should get tested "just in case." Well, she turned out to be positive as well.
I actually tested negative - so we did the whole "you live upstairs and I'll live downstairs thing" for the latter half of January.
My plan is to turn my attention from the layout and focus on bench projects - there are a number of half finished freight cars sitting around in various corners of the layout and workshop, and I want to focus on getting a South River kit finished.
Which leads to a link to a video update on my progress so far on the South River kit, which you can find on YouTube HERE.
