![]() |
| I placed the cannery in the front entrance area. The structures, such as the barn in the background and the various buildings visible in the previous photo, are stand-ins. |
![]() |
| The stationary end of the swing gate showing the slot the gate slides into. |
![]() |
| Action shot! The end of the swing gate. Note the paint scrapes indicating the friction lock. |
![]() |
| Closed position. I soldered the rail to some PC board ties on both the gate and the layout to help keep the rails aligned. |
With the mainline in place and operating, I've turned my attention to the two peninsulas - the papermill peninsula and the Richford peninsula.
![]() |
| A set of Fast Tracks twist ties glued to a piece of 1/8" plywood to form the lead into the paper mill yard. |
peninsula would benefit from a handlaid turnout or two. Besides, I continue to have issues with ME turnouts, meaning I might be handlaying all the turnouts on the two peninsulas.
I also have been laying out the track for the Richford yard. But that deserves it's own blog post.













