Please know that anyone impacted by Hurricane Ian is in our thoughts and prayers. Like just about every place else on the east coast this past weekend was a wash - literally - so I spent some time in the basement. My original goal was to get the track laid on the paper mill peninsula. That requires two custom curved turnouts. The track gods were not smiling on me - so after a completely frustrating several evenings and most of Saturday trying to build the fool things I pitched the bits of rail and nursed my burnt fingertips. Sunday was spent as far away from track laying as possible - adding an additional layer of scenery textures to Kempinski Curve. Nothing particularly unique - I used the same materials and techniques I've shared before. I still need to add a couple of more foreground trees to the left of the boxcar in the shot below:
I'm going to do battle with the track laying dragon again this evening - if success again eludes me I'll advance away from the enemy and regroup after the MARPM open house.
1 comment:
The scenery looks gorgeous. Nice job!
Post a Comment