The shot below shows how the scene looks after the twin mountains were removed. The flextrack shows the approximate location of the mainline realignment. The white paper cut out is the Williams Creek section template. Note this will take up some aisle space.
PHOTO 2 |
1. Option A: Place Williams Creek as shown in photo 2 and remove the through truss bridge. Fill in the river scene closest to the camera and add a small industry and perhaps a grade crossing.
2. Option B: Place Williams Creek where the paper template is shown in Photo 2 and slide the through truss bridge closer to the fascia and angle it to match the new mainline alignment. At this point the scene has the mainline crossing the same river twice, once on the through truss, the second time on the deck girder Williams Creek bridge. We assume the river bends "off scene."
3. Option C: Remove the through truss bridge and place the Williams Creek scene in its place. Photo 3 shows the Williams Creek template in position. It's hard to see since it's draped over the truss bridge, but this option doesn't require eating up any additional aisle space. I also think two bridges may be just a "little too much of a good thing."
PHOTO 3 |
I'm leaning towards Option C.