Pages

Tuesday, April 14, 2020

Agricultural Implement & Paint Dealer - Part 11 Trim, Stairs, and Test Fitting

Over my lunch breaks on the last few days I got the windows glazed and installed, added the trim, installed the doors, and even scratchbuilt a set of front steps. 
Steps were made by stacking square stripwood,
which was sanded and painted to give a concrete texture.
Today I even got the initial coat of Sculptamold in place to "plant" the structure. (It needs another coat). 
Sharp-eyed readers will note the wires emerging from the side of the structure. 
Trim was added using pre-painted
 1x6 and 1x8 stripwood.
I even installed the subsurface of the street. 
Things are shaping up nicely. 




1 comment: